AN INTEGRATED SOLUTION
Streamlined development, manufacturing, construction & delivery of complex, clean clinical environments turned on in as little as 2-3 weeks. Delivering a safer, smarter space to patients and staff.
Ceiling
The CLEAN CUBE Ceiling Consists of Just About EVERYTHING!
(fire suppression by base building)
- Reconfigurable modular plenum with terminally HEPA filtered air
- Optional air curtain with temperature differential
- Futureproofed structural raceway around all 4 sides of sterile field
- Structural engineered and tied into base building
- Full customized MEP in multi-trade racks and distributions
- Coordinated and tied in outside of CLEAN CUBE
- All in ceiling and grid LED lighting
- Ceiling surround outside of nest
Clinical Vendor Equipment
CLEAN CUBE is clinical vendor neutral and will accommodate any clinically driven equipment even when chosen at the last minute. Equipment is easily changeable and adaptable to changes in vendor, locations and modifications.
In-Wall Equipment
CEAN CUBE offers in-wall equipment, maintaining monolithic walls and protecting the equipment from damage. Touch capable and easily accessible from within the room when necessary.
Decontamination
CLEAN CUBE offers optional integrated and automated disinfection systems that can automatically clean continuously or at set intervals, ensuring up to 99.9999% cleanliness in your care environment.
Walls
Wall System
- Panelized walls are customized and preloaded with all MEP and other rough-ins
- Different depth options
- Smoke & fire rated UL rated assemblies
- Integrates with ceiling surround
- Accommodated integral cove base
- Integrates multiple door options
- Proprietary rail and clip system accommodates
5 different CUBE CLAD cladding options
(Additional finish options may be accommodated)
Doors
Door Systems
- Sliding or swing
- Fore rated options
- Hermetically sealing options
- Finish material options
- Multiple control options
- Multiple window and privacy options
Floor
CLEAN CUBE is inclusive of the floor, field installed, using the material of the projects choosing. Floors include an integral cove base to achieve a monolithic finish.