Time is money and the faster a healthcare institution is up and running, the faster the revenue generating stream can be turned on. Healthcare reform is quickly changing the environment and has created the race to be the big fish in the big pond. Market saturation, mergers, acquisitions and being the best are the essence of survival.
The modular pre-templated, pre-engineered, pre-manufactured components of the “Clean Cube” will allow for a dramatic reduction in construction time. This will save in construction dollars by reducing time, change orders and cost overruns. The modularity of the system is designed to be “agnostic” and future proofed for all clinically driven capital and integration items thus eliminating construction bottlenecks due to clinical uncertainty. This will allow for these top revenue generating areas to be down for less time and up and running sooner; producing a revenue stream much quicker than conventional construction.